Skip to content

Service 03 / 04

Manufacturing & testing

Assembly in our own plant and a pressure, leak and function test for every system — documented before delivery.

IMG-13b · ASSEMBLY HALL

01 — Included

What’s included.

Everything between a released design and a system ready to ship.

01

Assembly

Units, manifolds and frames assembled in our own plant in [City].

02

Wiring & control cabinets

Electrical wiring, sensors and control cabinets integrated and checked.

03

Pressure test

Every system tested on our test bench up to [X] bar.

04

Leak test

All connections checked for leaks before painting and delivery.

05

Function test

Movements, control and safety functions tested — under load where applicable.

06

Packing & delivery

Preserved and packed for transport; delivery to [regions – confirm].

02 — How we work

Four steps to a tested system.

One engineer leads all steps — no handovers.

01

Production planning

Materials, components and schedule fixed after the design is released.

[X days]

02

Assembly

Mechanical and electrical assembly in our plant.

[X weeks]

03

Testing

Pressure, leak and function test with a written report.

[X days]

04

Factory acceptance

Optional acceptance at our plant with your team before shipping.

Milestone

03 — Documentation

Documentation you receive.

Delivered in English and Romanian, ready for your acceptance and archive.

Test report

PDF

Declaration of conformity

PDF

Parts list

PDF · XLSX

Operating manual

PDF

As-built schematic

PDF · DWG

FAQ

Questions about manufacturing & testing

A pressure, leak and function test — documented in a test report.

Request

Discuss your manufacturing task.

Briefly describe your requirement — an engineer will get back to you within [one business day].

[Phone][Street No. · Postcode City · Country]

Selected · Service: Manufacturing & testing

Project inquiry

[Form is connected in step 7 — Contact Form 7]